作为防砂管柱的一部分,主要用于配长。上部延伸筒在充填时,承受充填液的冲击。
INTRODUCTION
As part of the sand-control string, extension is used for length design. Upper extension endures the impact of the pack fluid when pack.
Note: Other specification products are available.